SKS Surveys were instrumental in the launching of the 1200metre Seaford Rail bridge over the Onkaparinga River. The work involved setout out of all elements of the bridge structure at the launching pad to monintoring the structure during launching. This work was carried out at both the north and south abutments at the same time.
The Riverbank Precinct Pedestrian Bridge was unique project where a temporary structure was built 500 above water level. this supported the construction of the main bridge.
Several other standard bearing load bridges involving SKS Surveyors include